Combine slabs, pads, driveways, footings, walls, columns, and post holes into one project total — cubic yards, cubic feet, cubic meters, and bag estimates from Matervio’s shared concrete engine.

How this estimate is calculated

Project sections

Slab 1

Slab

Units
Waste

Extra material helps account for waste, uneven subgrade, spillage, and measurement variation.

Enter length.

Calculate Multiple Concrete Sections in One Project

Many jobs are more than one pour: a garage pad plus footings, a patio plus steps elsewhere on the site, or several fence post holes with a shed base. This tool adds those sections together so you can plan one ready-mix order or one bag shopping list.

How the Multi-Pour Calculator Works

Each section uses the same geometry path as Matervio’s specialty calculators: rectangular flatwork, strip or pad footings, walls, round or square columns, and cylindrical post holes. Per-section waste is applied first. Grand totals sum the unrounded cubic feet, then format yards, feet, and meters and run bag counts once on the combined recommended volume.

Why Total the Project Before Ordering?

Ordering section by section can leave you short on a continuous pour or overbuy when short loads stack up. A single project total helps you compare bagged mix against a ready-mix delivery before you call a plant.

Bagged Concrete vs Ready-Mix

Bag counts use Matervio’s shared 40–80 lb yields on the project total. Larger combined yardage often favors ready-mix, but access, labor, and supplier minimums still matter. Read ready mix vs bagged concrete and the ready-mix ordering guide before you decide.

Related Concrete Calculators

Related Concrete Calculators

Move to a tool that matches the next question on the job — volume by shape, bag counts, or material cost.

Browse all concrete calculators and project tools

For common size examples without entering dimensions, see the concrete project reference chart.

Multi-Pour Calculator FAQ

Can I combine slabs and footings?

Yes. Add each pour as its own section with the matching project type, then read the project total for combined cubic yards and bag counts.

Is waste calculated for each section?

Yes. Each section has its own waste allowance. The project total sums the waste-adjusted volumes from every valid section.

Are totals rounded before being added?

No. Section volumes stay at full precision until they are summed. Display rounding and bag counts happen after the grand total is formed.

Can I print the estimate?

Yes. Use Print estimate to open the browser print dialog. The print view keeps the section list and project totals.

Does Matervio save my dimensions?

The multi-pour project can be restored from your browser’s local storage on this device. Nothing is sent to Matervio accounts or a project database.