Estimate concrete volume for slabs, driveways, footings, walls, columns, and post holes. Results include cubic yards, cubic feet, cubic meters, waste allowance, and bag counts.

How this estimate is calculated

Your project

Project type
Units

Dimensions

L × W × T

Flatwork such as a patio is often about 4 inches thick. Use the thickness specified for your project.

Waste

Extra material helps account for waste, uneven subgrade, spillage, and measurement variation.

Your estimate

Enter the measurements and choose Calculate. The recommended order, volume breakdown, and bag counts appear here.

How to Calculate How Much Concrete You Need

For a step-by-step planning guide, read how much concrete do I need. For unit conversions only, see the concrete volume conversion chart. Common size examples live on the concrete project reference chart. Planning several pours at once? Use the multi-pour concrete calculator. When you are ready to call a plant, use the ready-mix ordering guide. For rectangular pours such as a slab or driveway, volume is:

Volume = Length × Width × Thickness

Cubic yards = Cubic feet ÷ 27

Convert every measurement to one unit before multiplying. A thickness in inches must become feet, or the volume will be twelve times too large.

Ready-mix in the United States is commonly ordered in cubic yards, which is why the result leads with that unit. Cubic feet stay useful for small pads and bag planning. Cubic meters are included so metric inputs can be checked without a second tool. Round columns and post holes use π × (diameter ÷ 2)² × height instead of the rectangular product.

How Much Extra Concrete Should You Order?

The calculator waste options are 0%, 5%, 10%, and 15%. Recommended order equals calculated volume × (1 + waste percentage ÷ 100).

Extra material can help account for uneven subgrade, measurement variation, spillage, and form irregularities. No percentage is universally correct. Use a lower allowance only when the forms and grade are tight; use a higher allowance when the base is rough or the pour is hard to place. Confirm the final order with your supplier—many plants sell in fixed yardage steps after your waste allowance.

Concrete Bag Coverage

Bag counts use the recommended volume, including the selected waste allowance, divided by each bag’s configured yield, then rounded up to whole bags. The yields below are the same assumptions used by the calculator engine for standard concrete mix. Actual yield can vary by product and manufacturer—verify the bag label before you buy.

Typical yields for standard concrete mix bags
BagTypical yieldBags per cubic yard
40 lb0.30 ft³90
50 lb0.375 ft³72
60 lb0.45 ft³60
80 lb0.60 ft³45

For a dedicated bag workflow, open the concrete bag calculator.

Concrete Bags or Ready-Mix?

Bags and ready-mix both start from the same volume. What changes is labor, access, delivery, supplier minimums, and local pricing. A small pad that a truck cannot reach may stay on bags. A larger continuous pour may favor a ready-mix delivery even when the bag math still works on paper.

There is no universal volume threshold that decides for every site. Compare both options with your measurements and the terms your local suppliers offer. For the bags-vs-truck walkthrough, see ready mix vs bagged concrete. More detail also lives on the bag calculator and the concrete tools hub. Website owners can also embed the same volume math with the Free Concrete Calculator Widget.

Concrete Calculator Examples

10 ft × 10 ft × 4 in slab

A common small patio or shed pad. Thickness converts from inches to feet before multiplying.

Step 1

Convert thickness to feet.

4 ÷ 12 = 0.333… ft

Step 2

Calculate cubic feet.

10 × 10 × (4 ÷ 12) = 33.333… ft³

Step 3

Convert to cubic yards.

33.333… ÷ 27 ≈ 1.235 yd³

Step 4

Apply a 10% waste allowance.

1.235 × 1.10 ≈ 1.358 yd³

10 ft × 10 ft slab, 4 in thick, 10% waste — same engine as the calculator.
Volume
33.3 ft³
Cubic yards
1.23 yd³
Cubic meters
0.94 m³
With 10% waste
1.36 yd³
40 lb bags
123
50 lb bags
98
60 lb bags
82
80 lb bags
62

These figures use the same formulas and display rounding as the calculator.

Small pad where bags may matter

A 4 ft × 3 ft × 4 in pad is a volume many people compare against bagged mix, especially when a truck cannot reach the pour.

4 ft × 3 ft pad, 4 in thick, 10% waste.
Volume
4.0 ft³
Cubic yards
0.148 yd³
Cubic meters
0.11 m³
With 10% waste
0.163 yd³
40 lb bags
15
50 lb bags
12
60 lb bags
10
80 lb bags
8

These figures use the same formulas and display rounding as the calculator.

Round post hole

Round work uses diameter, not radius. This example matches the post hole calculator formula.

12 in diameter × 3 ft deep post hole, quantity 1, 10% waste.
Volume
2.4 ft³
Cubic yards
0.087 yd³
Cubic meters
0.067 m³
With 10% waste
0.096 yd³
40 lb bags
9
50 lb bags
7
60 lb bags
6
80 lb bags
5

These figures use the same formulas and display rounding as the calculator.

How to Measure Your Concrete Project

Measure length and width (or wall height and thickness) in the plane of the pour, then measure thickness or depth separately. Keep units consistent, or let the calculator convert mixed feet and inches for you.

Thickness errors matter. Being off by half an inch on a large slab or driveway changes the order more than many people expect. For footings, walls, and columns, measure the cross-section that will actually be filled—not a nearby finished surface. Stairs need the dedicated steps calculator, because a stair is not a single rectangular box.

How Matervio Calculates Your Estimate

  1. Dimensions are converted to consistent base units.
  2. Project volume is calculated for the selected shape.
  3. Volume is converted to cubic yards, cubic feet, and cubic meters.
  4. The selected waste allowance is applied to the recommended order.
  5. Bag quantities use the configured bag yields on the recommended volume.
  6. Bag counts round upward to whole bags after the full-precision volume math.

Display rounding is separate from calculation precision. Intermediate math stays full precision; only the numbers shown to you are rounded. For editorial standards and formula maintenance notes, see the editorial policy.

Related Concrete Calculators

Move to a tool that matches the next question on the job — volume by shape, bag counts, or material cost.

Browse all concrete calculators and project tools

Concrete Calculator FAQ

How much concrete do I need?

Measure the pour, convert every dimension to the same unit, then multiply. For a rectangle, volume equals length × width × thickness. Divide cubic feet by 27 to get cubic yards, then add your chosen waste allowance before you order.

How many cubic feet are in a cubic yard?

There are exactly 27 cubic feet in one cubic yard. Ready-mix in the United States is usually quoted and ordered in cubic yards.

How much concrete should I order for waste?

This calculator offers 0%, 5%, 10%, and 15%. Extra material can help with uneven subgrade, measurement variation, spillage, and form irregularities. No single percentage fits every job—choose based on site conditions and your supplier’s advice.

How many bags of concrete do I need?

Divide the recommended volume, including waste, by the bag yield, then round up to whole bags. Yields used here follow the calculator’s configured values for 40, 50, 60, and 80 lb bags. Always confirm the yield printed on the product you buy.

How thick should a concrete slab be?

Thickness belongs on your plan or local requirement, not a single universal number. Many residential patio and sidewalk slabs are poured around 4 inches, while slabs that carry vehicles are often thicker. Enter the thickness you intend to pour.

Should I use bags or ready-mix concrete?

It depends on project size, labor, site access, delivery availability, supplier minimums, and local pricing. Small pads are often bagged; larger continuous pours are often ready-mix. Compare both for your site rather than using a fixed cutoff.

Does concrete bag yield vary by brand?

Yes. Coverage varies by product and manufacturer, and fast-setting mixes can differ from standard concrete mix. Use the bag label as the final authority for yield.