MATERVIO

Concrete Project Reference Chart

A printable, engine-backed chart of common concrete project sizes with raw and recommended cubic yards, bag counts, and dry packaged weight using Matervio’s shared yields.

Use this page when you need a quick sense of yardage for familiar footprints. Every volume and bag count is produced by the same concrete engine as the calculators — not hand-typed constants.

Thickness and depth values are labeled examples for quantity planning. They are not structural recommendations.

Common Concrete Project Quantities

Planning examples only. Assumed thickness or depth is labeled per row — not a structural requirement. Recommended volume includes 10% waste. Values come from Matervio’s shared concrete engine.
ProjectSizeAssumed depthRaw yd³Recommended yd³
Slabs / pads
Slab / pad
8 × 8 ft4 in (example)0.790.869
Slabs / pads
Slab / pad
10 × 10 ft4 in (example)1.231.36
Slabs / pads
Slab / pad
10 × 12 ft4 in (example)1.481.63
Slabs / pads
Slab / pad
12 × 12 ft4 in (example)1.781.96
Patio
Patio
10 × 12 ft4 in (example)1.481.63
Patio
Patio
12 × 16 ft4 in (example)2.372.61
Shed base
Shed base
8 × 10 ft4 in (example)0.9881.09
Shed base
Shed base
10 × 12 ft4 in (example)1.481.63
Driveway section
Driveway section
20 × 10 ft5 in (example)3.093.40
Driveway section
Driveway section
24 × 12 ft5 in (example)4.444.89
Driveway section
Driveway section
20 × 20 ft5 in (example)6.176.79
Footing
Strip footing
40 ft × 16 in8 in deep (example)1.321.45
Footing
Pad footings
4 × 24 in square12 in deep (example)0.5930.652
Post holes
Post holes
8 holes × 8 in dia.36 in deep (example)0.310.341
Post holes
Post hole
1 × 10 in dia.36 in deep (example)0.0610.067

Bag Counts for the Same Examples

Bag counts use the recommended volume (with 10% waste) and Matervio’s centralized bag yields. Dry packaged weight uses 80 lb bags × bag count — not wet concrete weight.
ProjectSize40 lb50 lb60 lb80 lbDry wt (80 lb)
Slab / pad8 × 8 ft796353403,200 lb
Slab / pad10 × 10 ft1239882624,960 lb
Slab / pad10 × 12 ft14711898745,920 lb
Slab / pad12 × 12 ft176141118887,040 lb
Patio10 × 12 ft14711898745,920 lb
Patio12 × 16 ft2351881571189,440 lb
Shed base8 × 10 ft987966493,920 lb
Shed base10 × 12 ft14711898745,920 lb
Driveway section20 × 10 ft30624520415312,240 lb
Driveway section24 × 12 ft44035229422017,600 lb
Driveway section20 × 20 ft61248940830624,480 lb
Strip footing40 ft × 16 in13110587665,280 lb
Pad footings4 × 24 in square594740302,400 lb
Post holes8 holes × 8 in dia.312521161,280 lb
Post hole1 × 10 in dia.6543240 lb

Ready-Mix Material Planning Note

Ready-mix material planning range (example)

For the 10 × 10 ft slab / pad row above (1.36 yd³ recommended), a national material-only band near $160–$195+ per cubic yard implies roughly $217.28–$264.81 before delivery, short-load fees, or installation. Source midpoint band: $160–$195+ per cubic yard. Local pricing varies. This is not installed cost.

Midpoint reference year: 2026. Last reviewed: October 2026.

Band endpoints × recommended yards: $160–$195 / yd³.

How to Read the Chart

Raw yd³ is calculated volume before waste. Recommended yd³ multiplies that volume by 1 + 10% / 100. Bag columns divide the recommended cubic feet by each bag’s configured yield and round up to whole bags. Dry packaged weight multiplies the 80 lb bag count by 80 lb — it is not wet concrete weight.

Why Your Actual Quantity May Differ

  • Actual length, width, and thickness on your plan
  • Chosen waste allowance and site conditions
  • Openings, steps, or irregular shapes not shown here
  • Supplier order increments and product yields on the bag

Calculate Your Exact Project

Bag Yield Planning

Bag yields follow Matervio’s centralized planning table for standard concrete mix. Coverage varies by product — confirm the yield printed on the bag you buy. For a live bag workflow, use the concrete bag calculator.

Reference Chart FAQ

Are these required project sizes?

No. Rows are common planning examples only. Enter your actual dimensions in a calculator for an exact estimate.

Does the chart include waste?

Yes. Recommended cubic yards and bag counts include a labeled 10% waste allowance. Raw cubic yards do not.

Is the thickness required?

No. Each flatwork row shows an example thickness or depth for quantity comparison. Use the thickness on your plan.