Strip Footings vs Pad Footings
Both use the same rectangular volume formula. The difference is how you describe the pour:
Strip: Volume = Run length × Footing width × Footing depth
Pad: Volume = Pad length × Pad width × Pad depth × Quantity
Cubic yards = Cubic feet ÷ 27
Depth here is concrete thickness. Crossing footings with a different cross-section should be calculated as a second run and added.
Matervio calculates material quantity from the dimensions you enter. It does not determine required footing width, depth, reinforcement, frost depth, structural capacity, or soil bearing requirements — those come from plans, local code, and site conditions.
Bag counts on the result use the same planning yields as the concrete bag calculator.
| Bag | Typical yield | Bags per cubic yard |
|---|---|---|
| 40 lb | 0.30 ft³ | 90 |
| 50 lb | 0.375 ft³ | 72 |
| 60 lb | 0.45 ft³ | 60 |
| 80 lb | 0.60 ft³ | 45 |
Typical planning yields for common concrete bag sizes are estimates. Actual yield may vary by product, brand, and mixing conditions. Always check the specific bag label before purchasing.
For the planning walkthrough behind bag counts, see how many bags of concrete do I need.
Strip Footing Example
Choose Continuous. Length is the run. Width and depth are the cross-section. A 50 ft run that is 16 inches wide and 8 inches deep is one rectangle with quantity 1. Examples list 40, 50, 60, and 80 lb bag counts from the waste-inclusive volume.
- Volume
- 44.4 ft³
- Cubic yards
- 1.65 yd³
- Cubic meters
- 1.26 m³
- With 10% waste
- 1.81 yd³
- 40 lb bags
- 163
- 50 lb bags
- 131
- 60 lb bags
- 109
- 80 lb bags
- 82
These figures use the same formulas and display rounding as the calculator.
Pad Footing Example
Choose Pads. Enter one pad, then the number of pads that share those dimensions. Four pads at 24 × 24 × 12 inches are four times one pad — not a 96-inch length.
- Volume
- 16.0 ft³
- Cubic yards
- 0.593 yd³
- Cubic meters
- 0.45 m³
- With 10% waste
- 0.652 yd³
- 40 lb bags
- 59
- 50 lb bags
- 47
- 60 lb bags
- 40
- 80 lb bags
- 30
These figures use the same formulas and display rounding as the calculator.
Bags or Ready-Mix for Footings?
Bagged concrete can be practical for smaller pads or access-limited footing pours. Longer continuous strip runs often make ready-mix more practical because of mixing time, labor, and continuity of placement — without a fixed yardage cutoff.
Footing Size Reference
Sample strip and pad geometries for planning, with volumes and bag counts. These are not design sizes — only quantity checkpoints with a labeled 10% allowance. Footing width, depth, reinforcement, and frost depth are set by plans and local requirements, not by this table.
| Footing | Quantity | Concrete (yd³) | With 10% waste (yd³) | 40 lb | 50 lb | 60 lb | 80 lb |
|---|---|---|---|---|---|---|---|
| 20 ft × 16 in × 8 in strip | 1 | 0.658 | 0.724 | 66 | 53 | 44 | 33 |
| 40 ft × 16 in × 8 in strip | 1 | 1.32 | 1.45 | 131 | 105 | 87 | 66 |
| 50 ft × 20 in × 10 in strip | 1 | 2.57 | 2.83 | 255 | 204 | 170 | 128 |
| 24 in × 24 in × 12 in pad | 1 | 0.148 | 0.163 | 15 | 12 | 10 | 8 |
| 4× 24 in × 24 in × 12 in pads | 4 | 0.593 | 0.652 | 59 | 47 | 40 | 30 |
| 36 in × 36 in × 12 in pad | 1 | 0.333 | 0.367 | 33 | 27 | 22 | 17 |
What to Estimate Separately
- Stem or basement walls — wall calculator.
- Round piers or formed columns — column calculator.
- Post holes filled as cylinders — post hole calculator.
Mixed foundations can be totaled with the concrete calculator after each piece is estimated. For a material cost check on larger strip volumes, see the concrete cost calculator.
How Matervio Calculates Your Footing Estimate
- Input dimensions are converted to consistent units.
- Length × width × depth determines one footing volume.
- Quantity multiplies identical pads or repeated runs when entered.
- Volume is converted to ft³, yd³, and m³.
- The selected waste allowance is applied.
- Bag estimates use configured yields on the recommended volume and round up.
Intermediate math stays full precision; display rounding applies only when numbers are shown. Editorial standards are described in the editorial policy.
Last reviewed: October 9, 2026.
Related Concrete Calculators
Move to a tool that matches the next question on the job — volume by shape, bag counts, or material cost.
Concrete Footing Calculator FAQ
What is the difference between a strip footing and a pad footing?
A strip (continuous) footing is a long rectangle: enter the run as length and the cross-section as width and depth, usually with quantity 1. A pad footing is a short block under a point load: enter one pad’s dimensions, then set quantity to the number of identical pads.
How do I calculate strip footing concrete?
Volume = length × width × depth for the concrete cross-section along the run. Convert mixed feet and inches before multiplying, divide cubic feet by 27 for yards, then apply waste. Keep quantity at 1 for a single continuous run.
How do I calculate pad footing concrete?
Compute one pad as length × width × depth, multiply by the number of matching pads, then apply waste. Do not put the pad count into the length field — use the quantity input.
Does depth mean excavation depth?
In this calculator, depth is the vertical thickness of the concrete footing itself. It is not the distance from finished grade down to the bottom of the excavation.
Will this size my footing?
No. It only multiplies the dimensions you enter. Footing width, thickness, reinforcement, and frost depth come from design and local requirements — not from this volume tool.
Can I add a wall on top of the footing?
Estimate the footing here, then estimate the wall separately with Matervio’s wall calculator and add the recommended volumes. Do not stretch wall height into the footing unless the drawing is truly one solid section.